T45 Port Expansion Project

Published:

T45 Port Expansion Project

The T45 Expansion Project was established by Fortescue Metals Group (FMG) to develop a mine to port export infrastructure capable of annual iron ore exports of 45MTPA. The project included the construction of the Cloudbreak Mine Site Ore Processing Plant and Train Loading Facility, a 250km Rail Link between the Cloudbreak Mine and Port Hedland and a Port Stockyard and Shiploading Facility at Anderson Point, Port Hedland.

Project Overview

A component of Fortescue Metals Group's (FMG) T45 Expansion Project was the development of a Port Stockyard and Shiploading Facility at Anderson Point, Port Hedland. The Port Facility would be capable of iron ore exports of 45MTPA and includes the following infrastructure:

  • Train unloading system
  • Overland conveyor network
  • Stockyard machines including 2 stackers & 1 reclaimer
  • Dual berth wharf with 1 shiploader

Scope of Work

Goodline were contracted to execute the structural, mechanical, piping, electrical and instrumentation and civil packages associated with the Port Facility located at Anderson Point. Goodline managed and constructed the following scope:

Civil

  • Conveyor foundations (concrete bored piers totalling 10km)
  • Transfer and sample station foundations

SMP

  • Installation and alignment of a conveyor network including 7 conveyor systems totalling 10km
  • Installation of 4 transfer stations
  • Installation of 1 sample station
  • Installation of conveyor belts totalling 20km including 70 belt splices
  • Transfer station process water piping and spray bar systems

E&I

  • Mechanical, electrical & instrumentation commissioning and initial operation support

 

Client

Fortescue Metals Group Limited

Project Type

SMP

Electrical and Instrumentation

Year of Completion

2007-2009

Project Location

Anderson Point, Port Hedland, WA

T45 Port Expansion Project