The T45 Expansion Project was established by Fortescue Metals Group (FMG) to develop a mine to port export infrastructure capable of annual iron ore exports of 45MTPA. The project included the construction of the Cloudbreak Mine Site Ore Processing Plant and Train Loading Facility, a 250km rail link between the Cloudbreak Mine and Port Hedland and a port stockyard and shiploading facility at Anderson Point, Port Hedland.

Project Overview

A component of Fortescue Metals Group's T45 Expansion Project was the development of a port stockyard and shiploading facility at Anderson Point, Port Hedland. The Port Facility would be capable of iron ore exports of 45MTPA and includes the following infrastructure:

  • Train unloading system
  • Overland conveyor network
  • Stockyard machines including 2 stackers and 1 reclaimer
  • Dual berth wharf with 1 shiploader

Scope of Work

Goodline were contracted to construct a foreshore protection system for the Port which involved the installation of 8km of concrete revetment bedding along the foreshore. Goodline's scope included:

  • Foreshore bank preparation
  • Geofabric installation
  • Lifting and placement of revetment flexmat moulds (320 crane lifts)
  • Concrete pumping (6000m³) into revetment moulds

 

Client

Fortescue Metals Group Limited

Project Type

Civil

Year of Completion

2007

Project Location

Anderson Point, Port Hedland, WA

Concrete Revetment Protection

Leaders in construction and maintenance services to Australia’s major resource companies.