Skip to main content
Loading...
Goodline News

Amrun Project - Material Handling Infrastructure

Amrun Project - Material Handling Infrastructure

Amrun Project - Material Handling Infrastructure

Rio Tinto Aluminium was developing a new bauxite mining, processing and export operation located on the west side of Cape York Peninsula in State of Queensland. FLSmidth were contracted to supply, deliver and installation of 3 material handling machines.

Project Overview

Goodline was engaged for the preassembly of the machines and SMP and E&I work and commissioning of a stacker, reclaimer and shiploader.

Scope of Work

  • Inspection and supervision during the preassembly of material handling machines in Perth prior to shipping
  • Support labour for the heavy logistic transport of modules from Hey River Terminal to site, Site erection (SMPE&I) and commissioning of :
    • Stockyard Stacker – Equipment Number BBST1001 (Stacker)
    • Stockyard Bucket Wheel Reclaimer – Equipment Number BBBWR1001 (Reclaimer)
    • Wharf Shiploader – Equipment Number BBSL1001 (Shiploader)

 

Client

FLSmidth / Bechtel / Rio Tinto Aluminum

Project Type

SMP, E&I

Year of Completion

2018

Project Location

Weipa, Qld

Amrun Project - Material Handling Infrastructure

Leaders in construction and maintenance services to Australia’s major resource companies.